| MOQ: | 5set |
| Price: | Negotiable |
| Payment Terms: | L/C,D/P,T/T |
| Supply Ability: | 500sets/Year |
This custom acrylic shower grab bar project, crafted for a luxury residential client, perfectly demonstrates JAFFA’s expertise in blending safety with minimalist bathroom design. The client desired a grab bar that would provide stability in the shower while seamlessly integrating with their modern, marble-tiled bathroom aesthetic—avoiding the bulky, utilitarian look of traditional metal bars. We delivered a sleek, wall-mounted grab bar crafted from 20mm ultra-clear acrylic, paired with brushed stainless steel mounting brackets. The transparent acrylic appears almost invisible against the marble, while the reinforced structure ensures it meets safety standards for weight-bearing and stability.
| Parameter Category | Project Customization Details | JAFFA Full Service Range |
|---|---|---|
| Core Material | 20mm ultra-clear acrylic (bar), brushed stainless steel (mounting brackets) | 100+ acrylic materials (clear, frosted, colored, anti-UV, scratch-resistant; 15mm–30mm thickness); metal brackets (stainless steel, brass, matte black) |
| Overall Dimensions | Customized to 60cm (L) * 3cm (D) (wall-mounted grab bar) | Custom size: 30cm (mini) to 120cm (large); custom curved/angled shapes supported |
| Structure Design | Seamless single-piece acrylic bar, wall-mounted with reinforced stainless steel brackets | 10+ structural templates (wall-mounted, corner-mounted, curved, straight, with/without grip grooves) |
| Surface Treatment | Ultra-clear high-gloss finish, precision edge polishing, seamless bonding | Polishing, sandblasting, UV printing, laser engraving, anti-scratch coating, anti-bacterial treatment |
| Accessory Configuration | Reinforced stainless steel mounting brackets, anti-slip grip grooves (optional) | Custom length, color, and finish; ADA-compliant safety testing; waterproof mounting hardware |
| Service Cycle | Design confirmation: 2 days; Production: 8 days; Installation: 1 day | Design: 1–3 days (3D renderings); Production: 5–12 days; Global shipping & installation hardware |